top of page

Our Work

We are focus on infrastructure construction projects.

01

Y20-753 SW Service Area
Potable Water Storage &
Repump Facility & Avalon Rd,
Master Pump Station

Construction of the
operations
building, including
machine rooms,
pumps, generator
and electrical
rooms.
 Construction of
slabs for the water
pipes.

02

Addition of VFDS to
Oak Meadows WSF and
Hidden Springs RF

Construction of
electrical room.
 Construction of
A/C pads.
 Construction of
slabs for the new
electrical room.
 Demolition of
existing windows
and entry to be
replaced with
blocks.
 Construction of
generator and fuel
slab.
 Construction of
pads for existing
motors and pipes.

03

Orange County Clerk of
Courts Courthouse at Metric

Drive

Construction of
sidewalk and curbs
around the existing
building.
 Construction of
generator pads.
 Construction of
secure parking
area including
foundation,
masonry and slab.
 Construction of
dumpster
enclosure
including
foundation,
masonry and slab.
 Construction of
holding cell
including
foundation,
masonry and slab.
 Installation of

bollards in areas
determined by the
client.
 Construction of
slab at main
entrance to
building.

04

Suntree Reclaimed
Water Pump Station

Building footers
and slab.
 Housekeeping
pads.
 Concrete pump
pads.
 Concrete pipe
supports.
 Construction of
pipeline building.
 Construction of
sidewalk around
the new building.
 Construction and
installation of
bollards.

bottom of page